Zmień język

  • Deutsch
  • Polski

ZAKŁAD BADAŃ LABORATORYJNYCH

Akredytowane laboratorium badawcze

Since 1 July 2013, the Regulation (EU) No. 305/2011 of the European Parliament and of the Council of 9 March 2011 called CPR (Construction Products Regulation) has been in force in the European Union. It describes the requirements for manufacturers of any construction products that must be met before marketing their products. The basic requirement is to introduce an on-site internal production process control conducted as part of procedures defined and implemented by the manufacturer, i.e. a so-called Factory Production Control. Implementation of an FPC system in a factory is performed on the basis of harmonised European standards (CE mark) or national standards (B construction mark).

The Laboratory Research Facility FERROCARBO Ltd. has been implementing FPC systems for years in Poland and Ukraine and the experience gained enables the company to quickly and efficiently introduce the system in a construction factory.

Calculation of costs related to the implementation of the FPC system depends on numerous factors. If you are interested in receiving a quote, please fill in the contact form.